Reliable Contracting Task Orders
Chicago, Illinois
DB Sterlin was responsible for the design of earth retention and support structures for the sewer improvement program. DB Sterlin provided structural engineering and CADD services for this project. Also, DB Sterlin prepared structural calculations and design plan sets for construction.
The scope of services for this project consisted of the design of a trench earth retention system and a temporary water main support. The design work performed by DB Sterlin included a Trench Earth Retention System for the installation of sewer pipe along S. Avenue L from E. 107th St. to E.110th St. and along E.110th St. from S. Avenue L to State Line Rd and the Design of Water Main Support at South Ave. L and East 110th Street.