• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

DB Sterlin Consultants, Inc.

  • Our Firm
  • Services
    • Civil Engineering
    • Construction Engineering Services
    • Land Surveying
    • Structural Engineering
    • Utilities Engineering
  • Projects
    • Airports
      • Chicago O'Hare International Airport (ORD) 2023 Structure Inspection
      • Quality Assurance and Material Testing at O'Hare and Midway Airports
      • Midway Airport Taxiways Y&K Reconstruction and Enhancement
      • Midway International Airport Terminal Parking Garage Expansion
      • O'Hare Modernization Program (OMP)
      • ORD & MDW Pavement Management Services
    • Bridges
      • CDOT Division Street Reconstruction
      • Chicago Bridge Inspection Team
      • Lake Street Bascule Bridge Rehabilitation
      • Independence Boulevard and Central Park Ave. Structures Over I-290
      • 31st Street Bridge over Metra Electric
      • Lincoln Village Bicycle and Pedestrian Bridge
      • Adams Street Bascule Bridge
      • Biennial Bridge Inspections
      • Bridge Construction Engineering Services for Bridge Repair Projects (Citywide)
      • District 1 Sign and Tower Structure Inspections
      • I-88 Reagan Memorial Tollway Reconstruction
    • Construction Engineering Services
      • Lincoln Yards South - Site Developement
      • Chicago Tunnel Systems Repair and Maintenance
      • 35th Street Bicycle and Pedestrian Bridge Over Lake Shore Drive
      • Bloomingdale Trail and Park
      • Category 8: City-Wide Roadway & Bridge Improvements (Task Order Services)
      • I-88 Reagan Memorial Tollway
      • Wacker Drive Reconstruction
      • Wells Street Bascule Bridge Rehabilitation
    • Rail
      • CTA Congress Line Racine Station
      • CREATE P3 / GS19 Grade Separation
      • Cermak Road Elevated CTA Green Line Station
      • CTA Red Line Reconstruction Project
      • Wilson Transfer Station Reconstruction
    • Roadways
      • PTB 201-006 - IL 43 (63rd to 65th)
      • Invest South West: Commercial Ave
      • Illinois 68 between Prairie Lake Road and IL 62 Algonquin Road
      • Right-turn Channelization and Traffic Signal Modifications
      • US Route 20 at Illinois Route 47/Illinois Route 72
    • Utilities
      • Reliable Contracting Task Orders
      • Bally's Casino - Dry Utility Design
      • Accelerated Main Replacement Program (AMRP)
      • City of Chicago Department of Water Management Coordinating Engineer
      • City of Chicago Sewer Main Replacement Program
      • City of Chicago Water Main Replacement Program
      • Com-ED Midway Load Conversion – Quality Inspection of Conduit and Manhole Installation
      • Inspection and Design of Light Pole Foundation on Vaulted Slab
  • Careers
  • Contact Us
  • Slide 1

Cermak Road Elevated CTA Green Line Station

Chicago, Cook County, Illinois

The scope of services for this project consisted of Phase III construction engineering services for the construction of the new Cermak Road Elevated CTA Green Line Station located on the south branch of CTA’s elevated Green Line. DB Sterlin’s responsibilities included documentation of daily activities, processing of material submittals, requests for information, pay estimates and change order modifications, construction inspection, project coordination, and all other duties that required the services of an engineer to successfully complete this project on a timely basis and in accordance with CDOT standards.

The project included the construction of a new rail station with entrances and fare collection at grade on the North side of Cermak Road and an auxiliary entrance/exit at 23rd Street. In addition, platforms, elevators, stairs, architectural finishes, station support rooms, communication, speaker and security systems, lighting, platform canopies for weather protection, concessionaire booth, and bike racks, and modifications to the existing Train Control System were also included. The new station will be ADA-accessible and have station house facilities located at grade level. The platform will be a center-island configuration for an eight-car train with canopy coverage for six cars. The station would have direct transfer connections to buses on Cermak Road and three entrance points on each side of Cermak Road and at 23rd Street.

Image

Image

Image

123 N Wacker Dr., Suite 2000
Chicago, Illinois 60606
312-857-1006info@dbsterlin.com
Embrace the past. Transform the Future.
© 2025 DB Sterlin Consultants, Inc. | Sitemap | Employee Portal
Website Designed by Chicago’s ePageCity.com