• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

DB Sterlin Consultants, Inc.

  • Our Firm
  • Services
    • Civil Engineering
    • Structural Engineering
    • Construction Engineering Services
    • Land Surveying
    • Utilities Engineering
  • Projects
    • Airports
      • Midway International Airport Terminal Parking Garage Expansion
      • Midway Runway 4L - 22R Rehabilitation
      • ORD & MDW Pavement Management Services
      • O'Hare Modernization Program (OMP)
      • Midway Airport Taxiways Y&K Reconstruction and Enhancement
    • Bridges
      • District 1 Sign and Tower Structure Inspections
      • I-88 Reagan Memorial Tollway Reconstruction
      • Bridge Construction Engineering Services for Bridge Repair Projects (Citywide)
      • Biennial Bridge Inspections
      • Adams Street Bascule Bridge
      • Bridge Deck Delamination Surveys
    • Construction Engineering Services
      • 35th Street Bicycle and Pedestrian Bridge Over Lake Shore Drive
      • Bloomingdale Trail and Park
      • Category 8: City-Wide Roadway & Bridge Improvements (Task Order Services)
      • I-88 Reagan Memorial Tollway
      • Wells Street Bascule Bridge Rehabilitation
      • Wacker Drive Reconstruction
    • Rail
      • Wilson Transfer Station Reconstruction
      • Cermak Road Elevated CTA Green Line Station
      • CTA Red Line Reconstruction Project
    • Roadways
      • US Route 20 at Illinois Route 47/Illinois Route 72
      • Illinois 68 between Prairie Lake Road and IL 62 Algonquin Road
      • Right-turn Channelization and Traffic Signal Modifications
    • Utilities
      • City of Chicago Sewer Main Replacement Program
      • Com-ED Midway Load Conversion – Quality Inspection of Conduit and Manhole Installation
      • City of Chicago Water Main Replacement Program
      • Accelerated Main Replacement Program (AMRP)
      • Inspection and Design of Light Pole Foundation on Vaulted Slab
      • City of Chicago Department of Water Management Coordinating Engineer
  • Careers
  • Contact Us
  • Slide 1

Midway International Airport Terminal Parking Garage Expansion

Chicago, Illinois

DB Sterlin was responsible for providing drainage design, retaining wall design, and construction support for the Midway Terminal Parking Garage Expansion. The civil work consisted of designing the proposed drainage, underground detention, and modification of existing drainage necessary for the garage expansion. The structural work involved designing two new retaining walls, retrofitting an existing retaining wall by installing permanent tiebacks, and removal and replacement of a portion of an existing retaining wall. The design work consisted of the preparation of plans, calculations, details, specifications, and the engineer’s estimate of the cost. During the construction phase, documentation services were provided for the processing, tracking, and review of all material submittals and shop drawings.

The scope of services for this project consisted of expanding the existing parking facility to provide more capacity and revenue for Midway International Airport. The expansion of the garage consisted of a new structure that was constructed east of the existing garage, providing an approximate net gain of 1,500 parking spaces for the Airport. Located over the existing Chicago Transit Authority (CTA) orange line rail yard, the proposed expansion provides parking on Levels 3 through 6 while Levels 1 and 2 remained open to accommodate CTA operations. The project also provided for several ancillary improvements, such as system upgrades to the existing parking facility, a new south entrance bridge, and ramp from northbound Cicero Avenue, reconstruction of the pedestrian walkway that connects the Airport to the CTA station, rehabilitation of several roadways including Kilpatrick Avenue from 55th Street to the south end of the existing parking facility, the City Access Road, and CTA Kiss and Ride area.

Image

Image

Image

In This Section

  • Airports
    • Midway International Airport Terminal Parking Garage Expansion
    • Midway Runway 4L – 22R Rehabilitation
    • ORD & MDW Pavement Management Services
    • O’Hare Modernization Program (OMP)
    • Midway Airport Taxiways Y&K Reconstruction and Enhancement
  • Bridges
  • Construction Engineering Services
  • Rail
  • Roadways
  • Utilities
123 N Wacker Dr., Suite 2000
Chicago, Illinois 60606
312-857-1006info@dbsterlin.com
Embrace the past. Transform the Future.
© 2023 DB Sterlin Consultants, Inc. | Sitemap
Website Designed by Chicago’s ePageCity.com