• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

DB Sterlin Consultants, Inc.

  • Our Firm
  • Services
    • Civil Engineering
    • Structural Engineering
    • Construction Engineering Services
    • Land Surveying
    • Utilities Engineering
  • Projects
    • Airports
      • Midway International Airport Terminal Parking Garage Expansion
      • Midway Runway 4L - 22R Rehabilitation
      • ORD & MDW Pavement Management Services
      • O'Hare Modernization Program (OMP)
      • Midway Airport Taxiways Y&K Reconstruction and Enhancement
    • Bridges
      • District 1 Sign and Tower Structure Inspections
      • I-88 Reagan Memorial Tollway Reconstruction
      • Bridge Construction Engineering Services for Bridge Repair Projects (Citywide)
      • Biennial Bridge Inspections
      • Adams Street Bascule Bridge
      • Bridge Deck Delamination Surveys
    • Construction Engineering Services
      • 35th Street Bicycle and Pedestrian Bridge Over Lake Shore Drive
      • Bloomingdale Trail and Park
      • Category 8: City-Wide Roadway & Bridge Improvements (Task Order Services)
      • I-88 Reagan Memorial Tollway
      • Wells Street Bascule Bridge Rehabilitation
      • Wacker Drive Reconstruction
    • Rail
      • Wilson Transfer Station Reconstruction
      • Cermak Road Elevated CTA Green Line Station
      • CTA Red Line Reconstruction Project
    • Roadways
      • US Route 20 at Illinois Route 47/Illinois Route 72
      • Illinois 68 between Prairie Lake Road and IL 62 Algonquin Road
      • Right-turn Channelization and Traffic Signal Modifications
    • Utilities
      • City of Chicago Sewer Main Replacement Program
      • Com-ED Midway Load Conversion – Quality Inspection of Conduit and Manhole Installation
      • City of Chicago Water Main Replacement Program
      • Accelerated Main Replacement Program (AMRP)
      • Inspection and Design of Light Pole Foundation on Vaulted Slab
      • City of Chicago Department of Water Management Coordinating Engineer
  • Careers
  • Contact Us
  • Slide 1

35th Street Bicycle and Pedestrian Bridge Over Lake Shore Drive

Cook County, Illinois

DB Sterlin provided construction inspection services for the 35th Street Bicycle and Pedestrian Bridge Over Lake Shore Drive project. Responsibilities included field inspection for adherence to plans and specifications, field measurements and quantity calculations, daily progress reports, monitoring maintenance of traffic activities, verifying contractor’s layout, and resolution of construction issues.

The project consisted of the removal of the existing 75-year-old pedestrian bridge and the construction of a new, self-anchored, post-tensioned suspension bridge. In addition to the removal of the bridge, the project also involved roadway drainage, lighting, and landscaping improvements to 35th Street, Lake Park Avenue, and Burnham Park. As part of the City’s Building a New Chicago program, the unique curving suspension bridge will provide impressive views of the skyline and Lake Michigan. The 620-foot concrete bridge features an A-shaped tower with a single suspension cable designed to support the bridge deck. The new bridge will span Metra and CN Railroads and South Lake Shore Drive, providing people with improved access to the lakefront.

Image

Image

Image

In This Section

  • Airports
  • Bridges
  • Construction Engineering Services
    • 35th Street Bicycle and Pedestrian Bridge Over Lake Shore Drive
    • Bloomingdale Trail and Park
    • Category 8: City-Wide Roadway & Bridge Improvements (Task Order Services)
    • I-88 Reagan Memorial Tollway
    • Wells Street Bascule Bridge Rehabilitation
    • Wacker Drive Reconstruction
  • Rail
  • Roadways
  • Utilities
123 N Wacker Dr., Suite 2000
Chicago, Illinois 60606
312-857-1006info@dbsterlin.com
Embrace the past. Transform the Future.
© 2023 DB Sterlin Consultants, Inc. | Sitemap
Website Designed by Chicago’s ePageCity.com