• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

DB Sterlin Consultants, Inc.

  • Our Firm
  • Services
    • Civil Engineering
    • Construction Engineering Services
    • Land Surveying
    • Structural Engineering
    • Utilities Engineering
  • Projects
    • Airports
      • Chicago O'Hare International Airport (ORD) 2023 Structure Inspection
      • Quality Assurance and Material Testing at O'Hare and Midway Airports
      • Midway Airport Taxiways Y&K Reconstruction and Enhancement
      • Midway International Airport Terminal Parking Garage Expansion
      • O'Hare Modernization Program (OMP)
      • ORD & MDW Pavement Management Services
    • Bridges
      • CDOT Division Street Reconstruction
      • Chicago Bridge Inspection Team
      • Lake Street Bascule Bridge Rehabilitation
      • Independence Boulevard and Central Park Ave. Structures Over I-290
      • 31st Street Bridge over Metra Electric
      • Lincoln Village Bicycle and Pedestrian Bridge
      • Adams Street Bascule Bridge
      • Biennial Bridge Inspections
      • Bridge Construction Engineering Services for Bridge Repair Projects (Citywide)
      • District 1 Sign and Tower Structure Inspections
      • I-88 Reagan Memorial Tollway Reconstruction
    • Construction Engineering Services
      • Lincoln Yards South - Site Developement
      • Chicago Tunnel Systems Repair and Maintenance
      • 35th Street Bicycle and Pedestrian Bridge Over Lake Shore Drive
      • Bloomingdale Trail and Park
      • Category 8: City-Wide Roadway & Bridge Improvements (Task Order Services)
      • I-88 Reagan Memorial Tollway
      • Wacker Drive Reconstruction
      • Wells Street Bascule Bridge Rehabilitation
    • Rail
      • CTA Congress Line Racine Station
      • CREATE P3 / GS19 Grade Separation
      • Cermak Road Elevated CTA Green Line Station
      • CTA Red Line Reconstruction Project
      • Wilson Transfer Station Reconstruction
    • Roadways
      • PTB 201-006 - IL 43 (63rd to 65th)
      • Invest South West: Commercial Ave
      • Illinois 68 between Prairie Lake Road and IL 62 Algonquin Road
      • Right-turn Channelization and Traffic Signal Modifications
      • US Route 20 at Illinois Route 47/Illinois Route 72
    • Utilities
      • Reliable Contracting Task Orders
      • Bally's Casino - Dry Utility Design
      • Accelerated Main Replacement Program (AMRP)
      • City of Chicago Department of Water Management Coordinating Engineer
      • City of Chicago Sewer Main Replacement Program
      • City of Chicago Water Main Replacement Program
      • Com-ED Midway Load Conversion – Quality Inspection of Conduit and Manhole Installation
      • Inspection and Design of Light Pole Foundation on Vaulted Slab
  • Careers
  • Contact Us
  • Slide 1

Illinois 68 between Prairie Lake Road and IL 62 Algonquin Road

Kane County and Cook County, Illinois

The scope of services for this project consisted of the preparation of construction documents comprised of plans, specifications, estimates, quantities, and details for the improvements to IL 68 from Prairie Lake Road to IL 62 (Algonquin Road) in Kane County and Cook County, IL. DB Sterlin prepared plans that included roadway engineering, drainage engineering, and utility coordination. Furthermore, construction staging and maintenance of traffic concepts were developed to ensure that at least one lane of traffic in each direction was open at all times. All documents were prepared in accordance with IDOT standards. In addition, a full topographic survey was conducted for the entire mainline as well as the crossroads. The survey work was extended 50 ft. beyond the edge of pavement of IL 68 at the crossroads. The sewer structures were opened and inspected to assess condition, determine the offset, and the construction material. Also, a complete sign inventory was performed and included all the signs within the survey limits. The existing right-of-way was assumed to be 100 feet wide. The triple box culvert located within the project limits was also surveyed and the inverts were collected.

The proposed improvement to IL 68 consisted of pavement milling and resurfacing, new 4’ paved shoulders with rumble strips, guardrail removal and replacement, replacement of outdated guardrail terminal sections, and pavement markings. IL 68 runs through the Spring Creek Valley Forest Preserve from Bateman Road to Old Sutton Road. The length of the improvement was approximately 3.2 miles.

Image

Image

Image

123 N Wacker Dr., Suite 2000
Chicago, Illinois 60606
312-857-1006info@dbsterlin.com
Embrace the past. Transform the Future.
© 2025 DB Sterlin Consultants, Inc. | Sitemap | Employee Portal
Website Designed by Chicago’s ePageCity.com