• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

DB Sterlin Consultants, Inc.

  • Our Firm
  • Services
    • Civil Engineering
    • Structural Engineering
    • Construction Engineering Services
    • Land Surveying
    • Utilities Engineering
  • Projects
    • Airports
      • Midway International Airport Terminal Parking Garage Expansion
      • Midway Runway 4L - 22R Rehabilitation
      • ORD & MDW Pavement Management Services
      • O'Hare Modernization Program (OMP)
      • Midway Airport Taxiways Y&K Reconstruction and Enhancement
    • Bridges
      • District 1 Sign and Tower Structure Inspections
      • I-88 Reagan Memorial Tollway Reconstruction
      • Bridge Construction Engineering Services for Bridge Repair Projects (Citywide)
      • Biennial Bridge Inspections
      • Adams Street Bascule Bridge
      • Bridge Deck Delamination Surveys
    • Construction Engineering Services
      • 35th Street Bicycle and Pedestrian Bridge Over Lake Shore Drive
      • Bloomingdale Trail and Park
      • Category 8: City-Wide Roadway & Bridge Improvements (Task Order Services)
      • I-88 Reagan Memorial Tollway
      • Wells Street Bascule Bridge Rehabilitation
      • Wacker Drive Reconstruction
    • Rail
      • Wilson Transfer Station Reconstruction
      • Cermak Road Elevated CTA Green Line Station
      • CTA Red Line Reconstruction Project
    • Roadways
      • US Route 20 at Illinois Route 47/Illinois Route 72
      • Illinois 68 between Prairie Lake Road and IL 62 Algonquin Road
      • Right-turn Channelization and Traffic Signal Modifications
    • Utilities
      • City of Chicago Sewer Main Replacement Program
      • Com-ED Midway Load Conversion – Quality Inspection of Conduit and Manhole Installation
      • City of Chicago Water Main Replacement Program
      • Accelerated Main Replacement Program (AMRP)
      • Inspection and Design of Light Pole Foundation on Vaulted Slab
      • City of Chicago Department of Water Management Coordinating Engineer
  • Careers
  • Contact Us
  • Midway airport taxiways Y&K

Midway Airport Taxiways Y&K Reconstruction and Enhancement

Chicago, Illinois

The scope of services for this project consisted of the full topographic survey and design plan documents for the Midway Airport Taxiways Y & K. DB Sterlin performed a full topographic survey which included the location of all surface features including man-holes and hand-holes, within the project limits. DB Sterlin also provided updated existing conditions, erosion control and restoration, and drainage design plans. Furthermore, DB Sterlin provided quantities, cost opinions, specifications, and details for the aforementioned design elements and assisted with RFI response and Shop Drawing review during construction.

The project included the pavement rehabilitation of Taxiway Y and Taxiway K at Midway International Airport. The work consisted of the mill (0”‐ 3”) and overlay with 6” of new bituminous asphalt pavement on the full width of Taxiways Y and D, widening of Y1 and Y2, and new asphalt pavement to the South Ramp for a remote hold apron area next to Runway 4R and full depth reconstruction of Taxiway K, including new PCC, new (20 foot wide) shoulder area and electrical lighting, cabling, and vault infrastructure improvements and landscaping. The scope of work also included the enhancements to the South Ramp area.

Midway airport runway

Image

Image

In This Section

  • Airports
    • Midway International Airport Terminal Parking Garage Expansion
    • Midway Runway 4L – 22R Rehabilitation
    • ORD & MDW Pavement Management Services
    • O’Hare Modernization Program (OMP)
    • Midway Airport Taxiways Y&K Reconstruction and Enhancement
  • Bridges
  • Construction Engineering Services
  • Rail
  • Roadways
  • Utilities
123 N Wacker Dr., Suite 2000
Chicago, Illinois 60606
312-857-1006info@dbsterlin.com
Embrace the past. Transform the Future.
© 2023 DB Sterlin Consultants, Inc. | Sitemap
Website Designed by Chicago’s ePageCity.com