• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

DB Sterlin Consultants, Inc.

  • Our Firm
  • Services
    • Civil Engineering
    • Construction Engineering Services
    • Land Surveying
    • Structural Engineering
    • Utilities Engineering
  • Projects
    • Airports
      • Chicago O'Hare International Airport (ORD) 2023 Structure Inspection
      • Quality Assurance and Material Testing at O'Hare and Midway Airports
      • Midway Airport Taxiways Y&K Reconstruction and Enhancement
      • Midway International Airport Terminal Parking Garage Expansion
      • O'Hare Modernization Program (OMP)
      • ORD & MDW Pavement Management Services
    • Bridges
      • CDOT Division Street Reconstruction
      • Chicago Bridge Inspection Team
      • Lake Street Bascule Bridge Rehabilitation
      • Independence Boulevard and Central Park Ave. Structures Over I-290
      • 31st Street Bridge over Metra Electric
      • Lincoln Village Bicycle and Pedestrian Bridge
      • Adams Street Bascule Bridge
      • Biennial Bridge Inspections
      • Bridge Construction Engineering Services for Bridge Repair Projects (Citywide)
      • District 1 Sign and Tower Structure Inspections
      • I-88 Reagan Memorial Tollway Reconstruction
    • Construction Engineering Services
      • Lincoln Yards South - Site Developement
      • Chicago Tunnel Systems Repair and Maintenance
      • 35th Street Bicycle and Pedestrian Bridge Over Lake Shore Drive
      • Bloomingdale Trail and Park
      • Category 8: City-Wide Roadway & Bridge Improvements (Task Order Services)
      • I-88 Reagan Memorial Tollway
      • Wacker Drive Reconstruction
      • Wells Street Bascule Bridge Rehabilitation
    • Rail
      • CTA Congress Line Racine Station
      • CREATE P3 / GS19 Grade Separation
      • Cermak Road Elevated CTA Green Line Station
      • CTA Red Line Reconstruction Project
      • Wilson Transfer Station Reconstruction
    • Roadways
      • PTB 201-006 - IL 43 (63rd to 65th)
      • Invest South West: Commercial Ave
      • Illinois 68 between Prairie Lake Road and IL 62 Algonquin Road
      • Right-turn Channelization and Traffic Signal Modifications
      • US Route 20 at Illinois Route 47/Illinois Route 72
    • Utilities
      • Reliable Contracting Task Orders
      • Bally's Casino - Dry Utility Design
      • Accelerated Main Replacement Program (AMRP)
      • City of Chicago Department of Water Management Coordinating Engineer
      • City of Chicago Sewer Main Replacement Program
      • City of Chicago Water Main Replacement Program
      • Com-ED Midway Load Conversion – Quality Inspection of Conduit and Manhole Installation
      • Inspection and Design of Light Pole Foundation on Vaulted Slab
  • Careers
  • Contact Us
  • Slide 1

Bally’s Casino Chicago Phase II Engineering Design & Phase III Construction

Chicago, Illinois

DB Sterlin is providing Dry Utility design and coordination for the Bally’s Hotel Tower, Casino/retail podium, Casino parking structure and Event Center (aka Bally’s Casino Development-Phase I). The scope of work includes topographic and boundary surveys, and design provisions for installation of utility infrastructure to serve future development parcels (Phase II Development) directly adjacent to the Bally’s Casino Development. In addition, DB Sterlin also provides schematic and final design development and coordination of all dry utility facilities for the $1.2 billion casino/hotel site development project, design of all power, natural gas, and telecommunications facilities for current and future site needs.

The $1.74 billion casino complex will be built on the 30-acre Chicago Tribune Publishing Center at the intersection of Chicago Avenue and Halsted Street, in the River West neighborhood. Bally’s Chicago will transform the currently underutilized site and is the largest casino in Illinois with 3,400 slot machines and 173 table games, 10 food and beverage venues, and a 500-room hotel tower with a rooftop bar. It will also feature a 65,000-sq-ft entertainment center with 3,000 seats, a 20,000-sq-ft exhibition space, an outdoor music venue, and a green space including a public riverwalk with a water taxi stop. Bally’s is expected to be open in 2026.

Image

Image

Image

123 N Wacker Dr., Suite 2000
Chicago, Illinois 60606
312-857-1006info@dbsterlin.com
Embrace the past. Transform the Future.
© 2025 DB Sterlin Consultants, Inc. | Sitemap | Employee Portal
Website Designed by Chicago’s ePageCity.com